Press the left button, drag the mouse, rotate the cube, see more information

Limit Discounts

Through this webpage, choose online customer service communication, or message board. Leave your needs and get limited time discounts, up to 10% off, saving you a fortune. This discount has an indefinite period, and places are limited on a first-come, first-served basis.

Payment Method

We support various payment methods:
T/T payment
VISA
paypal
MasterCard
Alipay etc
Save time in your buying process.

Certified Product

The company's products have passed multiple national
certifications:
for example:
United States: ASME
EU: CE
Eastern Europe: EAC
Russia: GOST
Singapore: MOMO
etc
Buy products, buy with confidence, use with confidence

Product Type

Domestic hot water and heating series: gas hot water boiler, vacuum hot water boiler, vertical atmospheric pressure hot water boiler, electric hot water boiler Factory use, high temperature steam: wns fuel gas steam boiler, szs water tube steam boiler, vertical steam boiler, electric steam boiler

About Us

FANGKUAI is founded in 1998, which is a clean fuel boiler enterprise integrating R&D, manufacturing, sales and service. In the past 20 years of development and innovation, the company has grown into a global enterprise, and its products have been exported to more than 80 countries including Russia, Mongolia and Thailand, and have established long-lasting cooperative relations with local enterprises!

Contact Us

If you are interested in our company or products, you can contact with us through online consulting, demand table submission, e-mails and telephones. Our staff shall wholeheartedly provide product information, application knowledge and good service for you.

Waste Heat Boiler Hydrotest

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :Waste Heat Boiler Hydrotest
  • Supply Capacity : 10 units/month :Waste Heat Boiler Hydrotest
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

boilermanufactory

Get display discount

boiler
Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • Glossary Of Boiler Terms - chemical-publishing.com

    BOILER - A closed vessel in which water is heated, steam is generated, steam is superheated, or any combination thereof, under pressure or vacuum by the application of heat from combustible fuels, electricity or nuclear energy. BOILER EFFICIENCY - The term boiler efficiency is often substituted for combustion or thermal efficiency.Get Price

  • MOSB Waste Heat Boiler Delivered - Power Technology

    Selnikel has successfully delivered a new waste heat boiler to a MOSB facility. In the power plant, which is operated by MOSB in Manisa Organised Industrial Zone, we built up a 33t/h, 43 bar, 195°C steam, and 150t/h, 90 / 70°C hot water production capacity, waste heat recovery boiler on the back of a T-250 …Get Price

  • Performing NDT in lieu of hydrotest - Boiler and Pressure

    Aug 29, 2013 · We have a waste heat boiler for new sulfur recovery unit. This equipment is in 3 sections. Boiler, reaction furnace and burner section. Boiler and reaction furnace are manufactured by one manufacturer and welded together and hydrotest at shop. Burner section is manufactured separately and hydrotested. At site first 2 sections are already erected on …Get Price

  • Waste Heat Boiler for Waste Incineration Market 2021

    The global Waste Heat Boiler for Waste Incineration market was valued at USD million in 2020 and it is expected to reach USD million by the end of …Get Price

  • Boiler,Industrial boiler manufacturer in China,Zhengzhou

    Reasonable Price of 20 T/H Coal Gas & Heavy Oil Fuel Boiler With ASME Liming; Good News | ZBG Shares Won the Bid for the Waste Heat Boiler Project in Hebei Carbon Industry Liming; Price List for the 4000 Kg/Hr Steam Boiler, Working Pressure Up to 16 Bars Liming; Congratulate! the 98-ton/hour Carbon Kiln Waste Heat Boiler Project in Qujing, Yunnan Was …Get Price

  • Waste Heat Boilers and Sulphur Condensers in the Sulphur

    Waste Heat Boilers and Sulphur Condensers in the Su lphur Process Industry: Facing the Large Plant Capacity Trend Current projects require SR and SA trains up to 350 t/h (1000 to 2000 tpd S 1 ) of gas flow-rate and 4000 MTPD of productGet Price

  • Packaged Biomass Boilers - Waste to Energy - CFS

    Large Scale Biomass, Waste to Energy steam packages and associated equipment. The first pass radiant chamber (inner coil) continuously formed 2" Schedule 80 carbon steel boiler tube, helical coil. Constructed strictly in accordance with ASME rules and regulations. All welds radiography and complete coil module hydrotested prior to shipping.Get Price

  • EST roup - Test Plugs, Heat Exchanger, Isolation Plugs

    EST Group Field Services provides a complete range of on-site heat exchanger services for waste heat boilers, shell and tube heat exchangers, air cooled heat exchangers, condensers, and oil coolers. Our team also provides Hydrostatic testing services for …Get Price

  • Boiler room Guide - D.J. Conley

    Boilers that generate steam from an external source of energy, commonly referred to as waste heat boilers, are fabricated in accordance with section Viii of the AsME Code. Deaerators, surge tanks or other pressurized tanks, referred to as unfired pressure vessels, are …Get Price

  • 1996: Failure, Repair and Replacement of Waste Heat …

    About Waste Heat Boilers. Boiler Control System Safety Aspects. The topics below were contributed by Rentech Boiler Systems.We hope they are useful to you. If you see corrections that should be made, or want to add information, please contact Banks Engineering!Get Price

  • Cause of Localized Corrosion of Reformed Gas Boiler Tube

    Apr 03, 2005 · Leakage occurred in more than 21 tubes of reformed gas (waste heat) boiler tubes during a hydrotest after 8 years of service life. The tube material is low alloy carbon steel SA213 T11 with outer diameter (OD) of 38.1 mm (1.5-inches), 5.15 mm (0.2-inch) wall thickness and length of 6858 mm (270-inches).Get Price

  • Rapid waste heat boiler retubing at IPL Mount Isa

    Challenges for IPL Mount Isa. In the case of the IPL Mount Isa sulphuric acid plant, 2014 presented some very serious challenges associated with maintaining the site's 16 year old No. 1 Waste Heat Boiler (WHB1). WHB1 is a horizontal tubesheet boiler with 859 tubes, 70mm diameter x 9000mm long. The boiler shell is 3410mm ID and 45mm thick.Get Price

  • HRSG Part 1 - KAKA Engineering, we're driving the future

    ไม่งง พวกเรา waste heat boiler คือ waste heat boiler ความร้อนที่เข้า จะมาจากแหล่งต่างๆ ในกระบวนการผลิต ส่วนใหญ่ที่พบเจอจะเป็นเตาเผา โรงปูน, โรงกระเบื้อง, เซรามิค bla Get Price

  • Energy-from-Waste Milestone Achieved- Boiler Hydro Test

    Home Energy-from-Waste Milestone Achieved- Boiler Hydro Test Video. November 8, 2021. 9 likes. Successful hydro test of the boiler in the Energy-from-Waste plant under construction, performed on Sunday 31.10.2021. YouTube.Get Price

  • Steam Separator - an overview | ScienceDirect Topics

    Where high availability is required, lower heat release rates may be specified by the company. The maximum heat flux density at any localized "hot spots" should not exceed 300 kW/m 2 (95,000 Btu/ft 2 h). The boiler designer should present with his proposal the predicted furnace heat flux distribution along the length and height of the furnace at MCR and state the maximum and …Get Price

  • Waste Heat Recovery - Energy

    Figure 10 ­Finned Tube Exchanger/Boiler Economizer 16 Figure 11 ­Waste Heat Boiler 17 Figure 12 ­Stack Melter in A Die Casting Facility 17 Figure 13 ­Heat Recovery Curve for Natural Gas­Fired Boiler 18 Figure 14 ­Direct Contact Condensation Heat Recovery 20Get Price

  • heat recovery boiler hydro test procedures

    Waste Heat Recovery Boiler - Thermodyne Boilers. Waste Heat Recovery Boilers (WHRB) - Wastetherm is manufactured by Thermodyne- are designed to recover heat from waste flue gases from DG exhaust, Furnace exhaust to produce steam or hot water. WHRB, industrial boilers are advanced enough to deliver max possible heat recovery & save money.Get Price

  • Failure of Waste Heat Boiler in a Kellogg Designed Ammonia

    boiler feed water. All these actions led to a common conclusion that there might have been a possibility of boiler feed water leaking into the system through the tube bundle of Waste Heat Boiler 101-CB as outlet temp of only 101-CB went down. Therefore, a forced complete shutdown of the plant was taken. On subsequentGet Price

  • Performance Guarantee Test Assessment of CFBC …

    Mar 11, 2007 · During hydrotesting in a routine maintenance turnaround in early 2006, boiler feed water was found to be leaking to the process side in the SRU WHB. Visual inspection of the tubes revealed that 80% of the tubes in the WHB bundle had suffered varying degrees of deformation.Get Price

  • suppliers of hydro boilers 15 liters – Industrial

    hydro-steam and portable steam boilers. pressure range 15 PSIG to 3500 PSIG, waste heat boilers, Manufacturer* Manufacturer of steam boilers. Steam boiler . Boilers in Western Pennsylvania Boilers Suppliers serving Western Pennsylvania . Specifications include 7.9 liters to 1987 liters volume,Get Price

  • EP0062344A2 - Waste heat boiler and steam superheater

    in a system comprising a waste heat boiler, a steam drum, a steam superheater, means for passing water through said waste heat boiler to produce steam, means for passing the steam to said drum, means for passing steam from said steam drum through said steam superheater to produce superheated steam and means for passing a process stream through the shell of said …Get Price

  • Waste Heat Boiler | Steel Fabrication Australia

    The Waste Heat Boiler was delivered to Queensland and installed into the Nitric Acid Plant. The scope of work included thermal and mechanical design, material supply, fabrication, manual tube welding, local PWHT, hydrostatic testing, surface treatment, preservation and delivery to site. When analysing the existing equipment we identified Get Price

  • Waste Heat Boilers - Rentech Boilers

    RENTECH Boiler Systems offers a full range of custom designed waste heat recovery boiler systems to meet your most demanding project requirements. RENTECH is an American boiler manufacturer known for its ability to provide custom engineered solutions for a wide variety of applications. We offer a full range of boilers capable of producing up to Get Price

  • waste heat boiler ferrule - ZBG Boiler

    ABSTRACT Leakage occurred in more than 21 tubes of reformed gas (waste heat) boiler tubes during a hydrotest after 8 years of service life. The tube material is low alloy carbon steel SA213 T11 with outer diameter (OD) of 38.1 mm (1.5-inches), 5.15.Get Price

  • Publications - Porter McGuffie, Inc

    Waste heat boilers fail because we try to operate them at levels beyond which we can adequately design and safely control them to provide reliable operation. Typically waste heat boilers (WHBs) fail due to three factors: excessive temperature, excessive mass …Get Price

  • Waste heat boilers | Steam generation | Hot water production

    Waste heat boilers utilise the heat in flue gases from combustion processes or hot waste air flows from industrial processes to generate hot water or saturated steam. Due to economic and legislative considerations, waste heat boilers are frequently used in conjunction with gas turbines and combined heat and power units.Get Price

  • procedure in hydrostatic pressure test for boiler in the

    HYDRO TESTING – HYDROSTATIC TESTING. Hydro testing is pre-commissioned procedure to test … called the modified hydrostatic test. Testing of pressure vessels for …. Chat Now. 815 KAR 15:026. Existing boilers and pressure vessels …. Existing boilers and pressure vessels; testing, repairs, inspection, ….Get Price

  • About Waste Heat Boilers

    About Waste Heat Boilers. Boiler Control System Safety Aspects. The topics below were contributed by Rentech Boiler Systems.We hope they are useful to you. If you see corrections that should be made, or want to add information, please contact Banks Engineering!Get Price

  • Waste heat recovery - Alfa Laval

    waste heat recovery is to try to recover maximum amounts of heat in the plant and to reuse it as much as possible, instead of just releasing it into the air or a nearby river. Figure 1.2 Energy flow without waste heat recovery Figure 1.3 Energy flow with waste heat recovery Fuel Heat generation (boilers, heaters) Process Cooling SurroundingsGet Price

  • 4th Class Boiler Test 2 - ProProfs Quiz

    Feb 13, 2013 · 4th Class Boiler Test 2. 1. 2. The economizer in the steam cycle of an electricity generating plant is located between the: Superheater and the turbine. 3. 4. That there is a proper air flow through the furnace. That all external parts …Get Price

Discount
7X24 Online