Through this webpage, choose online customer service communication, or message board. Leave your needs and get limited time discounts, up to 10% off, saving you a fortune. This discount has an indefinite period, and places are limited on a first-come, first-served basis.
We support various payment methods:
T/T payment
VISA
paypal
MasterCard
Alipay etc
Save time in your buying process.
The company's products have passed multiple national
certifications:
for example:
United States: ASME
EU: CE
Eastern Europe: EAC
Russia: GOST
Singapore: MOMO
etc
Buy products, buy with confidence, use with confidence
Domestic hot water and heating series: gas hot water boiler, vacuum hot water boiler, vertical atmospheric pressure hot water boiler, electric hot water boiler Factory use, high temperature steam: wns fuel gas steam boiler, szs water tube steam boiler, vertical steam boiler, electric steam boiler
FANGKUAI is founded in 1998, which is a clean fuel boiler enterprise integrating R&D, manufacturing, sales and service. In the past 20 years of development and innovation, the company has grown into a global enterprise, and its products have been exported to more than 80 countries including Russia, Mongolia and Thailand, and have established long-lasting cooperative relations with local enterprises!
If you are interested in our company or products, you can contact with us through online consulting, demand table submission, e-mails and telephones. Our staff shall wholeheartedly provide product information, application knowledge and good service for you.
PWHT and tube repairs - Boiler and Pressure Vessel
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
and to provide inspection service of boilers and pressure vessels in such State or Province. 4 8. BOILER - A closed vessel in which water or other liquid is heated, steam or vapor is generated, steam or vapor is superheated, or any combination thereof, under pressure or vacuum, for use external to itself, by the direct Get Price
ASTM A179: Minimum-wall thickness, seamless cold-drawn low-carbon steel tubes for tubular heat exchangers, condensers, and similar heat transfer apparatus. Tubes shall be made by the seamless process and shall be cold drawn. ASTM A106: Carbon steel pipe for high-temperature service. These pipes are suitable for welding, bending, flanging, and similar forming operations.Get Price
The National Board of Boiler and Pressure Vessel Inspectors 2. General Considerations by the "R" Certificate Holder (Cont.) and a tube will require a new length of tube or tube patch (see NBIC Part 3, 3.3.4.6 b). PWHT on a repair "may" not always be practical, possible or advisable, hence for our repair, method 1 will be looked Get Price
National Board Inspection Code - A manual for boiler and pressure vessel inspectors, National Board of Pressure Vessel Inspectors, Columbus, Ohio, USA, 2007, with 2009 Addendum: Part 3, Section2.5.3. Doty W D: 'History and need behind the new NBIC rules on weld repair without PWHT', Welding Research Council Bulletin 412, June 1996, 3-8.Get Price
Ortman, E, & Vattappilly, J. "Introduction to Power Boilers." Online Companion Guide to the ASME Boiler and Pressure Vessel Codes: Criteria and Commentary on Select Aspects of the Boiler & Pressure Vessel Codes. ASME Press, 2020.Get Price
"Exemptions to Mandatory [post weld heat treatment] PWHT," of the 2006 Addenda to the 2004 Edition of Section III to the ASME Boiler and Pressure Vessel Code, Subsection NB as an alternative for the RT system piping to be installed during the 13th refueling outage. Table NB-4622.7(b)-1, provides exemption criteria from mandatory PWHT. 2.0Get Price
Nov 20, 2020 · Heatmasters Service Combo: Pre-Heating and PWHT Of Boiler Drums " alt="Heatmasters"> Last month, we wrote about our cooperation with ENITEC Sp. z o.o. (Grupa ENERGOINSTAL S.A.), manufacturer of boiler components and pressure vessels for the energy industry at the highest quality levels.Get Price
Note: For books other than the Boiler & Pressure Vessel Code (e.g., B31.1, PTC 25, NQA-1), the required edition as of July 1, 2013 is listed. The specific effective Addenda will be referenced in the applicable Boiler and Pressure Vessel Code section. Later …Get Price
Nov 20, 2020 · Heatmasters Service Combo: Pre-Heating and PWHT Of Boiler Drums " alt="Heatmasters"> Last month, we wrote about our cooperation with ENITEC Sp. z o.o. (Grupa ENERGOINSTAL S.A.), manufacturer of boiler components and pressure vessels for the energy industry at the highest quality levels.Get Price
Jan 18, 2016 · We have a new ASME Section I boiler under construction and have found an issue with the Secondary Superheater Outlet Header. One of the top support lugs was installed in the wrong location. The superheater header is a P5B material, 1.5" thick, 18" ID and was PWHT'd at header fabrication.Get Price
May 20, 2005 · The welding in of a plug to seal tubes in a boiler or pressure vessel is considered a "repair" by the NBIC (National Board Inspection Code). Your State Jurisdiction will very likely require you to have an "R" Stamp Certificate of Authorization for completing this repair, (even if you are the Owner). Before making any repairs --the welding Get Price
A boiler operator wished to waive PWHT of a stub-to-header weld repair. The parent material was 2¼Cr½Mo steel. The header collects steam from the boiler superheater via several hundred separate boiler tubes, Fig.3.Get Price
The most frequent contact with these vessels as a repair organization or inspector is the repair or alteration of over-the-road liquid petroleum gas (LPG) transport vessels. The information contained in this article pertains to vessels fabricated utilizing Code Case 1204-11 or Section VIII, Div. 1, Part UHT, depending on the year built.Get Price
3. Boiler / Pressure Vessel Details Vessel Description Manufactured By Code Built to CRN MB Unit № Serial № Other № 4. Defects that resulted in the Repair / Alteration: (Reference and attach copy of NDE reports) 5. (Reference all docs such as Drawings, PWHT, Weld Procedures, Welder ID and attach to your submission) 6. MaterialGet Price
Apr 03, 2018 Rating: pwht NEW by: Anonymous i am working in a pressure vessel head manufacturing company. i want to know about pwht. are pwht is done in entire head or just in a test plate weld only ? we are doing three types of heat treatment such as normalizing, solution annealing, stres relieving which is done based on fiber elongation value.Get Price
Aug 18, 2016 · In particular, spot or "bulls eye" configurations are often employed in industry to perform PWHT following local weld repairs. Both the ASME Boiler and Pressure Vessel (B&PV) Code and the National Board Inspection Code (NBIC) permit the use of local PWHT around nozzles or other pressure boundary repairs or alterations.Get Price
Boiler and pressure vessel repair On site PWHT utilizing resistance, induction or mechanical methods Pressure vessels, heat exchangers, accumulators, cryogenicsGet Price
The vessel was operated under the owner/user option of the Illinois Boiler and Pressure Vessel Safety Act and received a certification inspection approximately every two years. Continuing corrosion problems in the lower end of the vessel resulted in the installation of an internal Monel liner in 1976 covering the bottom head and most of the Get Price
This paper provides commentary on a new division under Section III of the ASME Boiler and Pressure Vessel (BPV) Code. This new Division 5 has an issuance date of November 1, …Get Price
Power plant maintenance ASME S, U and NBIC R code stamps Pressure vessel design and fabrication Boiler and pressure vessel repair On-site PWHT utilizing resistance, induction or mechanical methods Pressure Vessels, heat exchangers, accumulators, cryogenics Field Services Predictive Maintenance Kingman AZ - 928-757-8424 Electrical Apparatus Repair Equipment …Get Price
Subject: Repairs to a Pressure Retaining Part. Edition: 2017. Question: Is it permitted to perform a repair in accordance with the NBIC of a part that has not yet been installed in a pressure vessel or boiler that has not been completed in accordance with the code of construction? Reply: No. The NBIC rules for repairs do not apply to items not Get Price
a Tube Sheet Field Repair Determine if the Code status of the Item is to be maintained. • Jurisdictional requirements • NBIC requirement • Code of Construction requirements. The National Board of Boiler and Pressure Vessel Inspectors 2. The repair example used in the presentation is an ASME Section I boiler. However, thisGet Price
National Board Inspection Code - A manual for boiler and pressure vessel inspectors, National Board of Pressure Vessel Inspectors, Columbus, Ohio, USA, 2007, with 2009 Addendum: Part 3, Section2.5.3. Doty W D: 'History and need behind the new NBIC rules on weld repair without PWHT', Welding Research Council Bulletin 412, June 1996, 3-8.Get Price
PWHT Requirements in Pressure Vessel Inspections The ASME Boiler & Pressure Vessel Code (BPVC) is an American Society of Mechanical Engineers (ASME) standard that regulates the design and construction of boilers and pressure vessels. The document is written and maintained by volunteers chosen for their technical expertise .Get Price
The vessel was operated under the owner/user option of the Illinois Boiler and Pressure Vessel Safety Act and received a certification inspection approximately every two years. Continuing corrosion problems in the lower end of the vessel resulted in the installation of an internal Monel liner in 1976 covering the bottom head and most of the Get Price
Within this project a cold weld repair procedure without gas backing is developed for thinwalled T91. tubes, for applications in boilers, where the safety risk is limited. Hardness values below Get Price
A boiler operator wished to waive PWHT of a stub-to-header weld repair. The parent material was 2¼Cr½Mo steel. The header collects steam from the boiler superheater via several hundred separate boiler tubes, Fig.3.Get Price
A Guide to Jobs Within the Mining IndustryGet Price
pressure vessels in most services. ASME's Boiler and Pressure Vessel Committee adopted substantially identical provisions and published them as a nonmandatory appendix in the 1950, 1952, 1956, and 1959 editions of Section VIII of the ASME Boiler and Pressure Vessel Code.Get Price
Nov 23, 2015 · Flush patch or window repairs were intended for use when replacing boiler tubes where butt welding could not be performed 360 degrees. It was never intended to locally repair tubes. Instead remove the failed section and install a dutchman. RE: PWHT and tube repairs. chicopee (Mechanical) 25 Nov 15 20:53.Get Price